Search:      
Contact Code One Subscribe to Code One Code One Home Page Air Mobility Combat Aircraft Reconnaissance Code One Archives Code One Photos Code One Art History People
Events

1st Qtr. 2008

4th Qtr. 2007

3rd Qtr. 2007

2nd Qtr. 2007

1st Qtr. 2007

4th Qtr. 2006

3rd Qtr. 2006

2nd Qtr. 2006

1st Qtr. 2006

4th Qtr. 2005

3rd Qtr. 2005

2nd Qtr. 2005

1st Qtr. 2005

4th Qtr. 2004

3rd Qtr. 2004

2nd Qtr. 2004

1st Qtr. 2004

4th Qtr. 2003

3rd Qtr. 2003

2nd Qtr. 2003

1st Qtr. 2003

4th Qtr. 2002

3rd Qtr. 2002

2nd Qtr. 2002

1st Qtr. 2002

4th Qtr. 2001

3rd Qtr. 2001

2nd Qtr. 2001

1st Qtr. 2001

4th Qtr. 2000

3rd Qtr. 2000

2nd Qtr. 2000

F-35 Ground Testing Under Way

F-35 Ground Testing Under Way The first production F-35 Joint Strike Fighter to roll off the assembly line completed two important sets of ground testing in early spring: fuel system checkout and structural coupling. Fuel system checkout, completed 12 March, included filling, weighing, and emptying each internal fuel tank with jet fuel. Structural coupling testing, completed 17 April, consisted of initiating a wide range of specific flight control movements using the aircraft’s onboard systems. Eight different fuel and weapons load configurations were evaluated. The two internal weapons bays on the aircraft were loaded with inert Joint Direct Attack Munitions and air-to-air missiles for the first time. First flight of the F-35 is scheduled for later this year.


Back to Events Index

Page 4 of 20
Back 1 2 3 4 5 6 7 8 9 10
11 12 13 14 15 16 17 18 19 20
Next
CodeOne Bottom Nav
Home   Air Mobility   Combat Aircraft   Reconnaissance   Archives   Photos   Art   History   People
Contact Us   Subscribe   Search   Site Map